Record intelligence

Prepare Daily Work Records for a useful review

Madany

A useful review starts with a clear set of records and a clear question. You do not need to make every file look the same before discussing the scope.

Define the question and period

Start by stating what your team wants to understand. You may want to review reported labour, compare quantities across a reporting period or identify recurring field observations. Choose a project area and date range that match that question. A defined boundary makes it easier to decide which records belong in the review.

Keep the original files

Preserve the original records and provide revisions as separate versions. A renamed or corrected file should still be traceable to its source. If the same report appears more than once, identify the preferred version where you can. Do not remove an inconvenient observation to make the dataset appear cleaner.

Explain the fields and units

Short descriptions can prevent important misunderstandings. Explain local abbreviations, activity names and location codes. State whether hours represent individual person-hours, a crew shift or machine operating time. Keep quantity units visible and identify any changes in how work was measured.

Flag gaps and uncertainty

A missing daily report, unreadable note or incomplete quantity field is useful context. Flag the gap and say whether a clarification is available. A reviewer should be able to distinguish an absent value from a genuine zero. Uncertainty belongs in an exceptions register until it is resolved.

Agree how records will be shared

Before sending project files, confirm that you have authority to share them and agree a suitable transfer method. Remove personal information that is unnecessary for the agreed analysis. A first inquiry can describe the project without attaching records.

Madany starts by discussing the records and the outputs your team needs. See the service scope for the types of information a DWR pilot can examine.

Continue reading

Record intelligence

Read productivity figures with context

A quantity-to-hour ratio is a description of selected records. Its usefulness depends on the activity, the units and the hours included.

Read about productivity
Record intelligence

Why source references matter

A project observation is easier to review when the team can find the records and calculations behind it.

Read about source references